How we build · Stage 03

Design

Make it real enough to test before it is expensive to change.

Typical duration
3–8 weeks, usually overlapping Build
Portal phase
design
Stage
03 of 08
CRM stages
2

What this stage is for

We design the product as a working system, not a slide deck: flows, states, content, accessibility and a component library engineers can build against directly.

Your part

Review prototypes with real users where possible. Make decisions at the review points.

Activities

What happens

  • Information architecture and end-to-end flows
  • Interaction design including empty, loading, error and permission states
  • Interface design and a documented design system
  • Content design and editorial voice
  • Accessibility design against WCAG 2.2 AA
  • Prototype testing with representative users

Outputs

What you get

  • Clickable prototype of the critical journeys
  • Design system with tokens, components and usage rules
  • Annotated specifications including states and accessibility behaviour
  • Research findings and the design changes they caused

Exit criteria

We do not move on until

Written down so neither side has to rely on a feeling that things seem fine.

  • Critical journeys are tested and the findings are acted on
  • The design system covers every component the first release needs
  • Content for the first release is drafted or has an owner and a date

Behind the scenes

How this shows up in our systems

This is not a diagram made for a website. The stage you are reading maps onto literal values in our CRM and the phase label in your client portal.

CRM pipeline stages
Won / onboardingSigned. Setting the project up.DeliveryDesign and build are running.
What you see in the portal
Your project shows the phase "design", with this stage's purpose and your part written on the project page.

Where it applies

Services that run this stage

Service

Create

Flows, states, content and a design system, tested with users.

Next step

Talk to us about design

The Project Architect asks the questions this stage depends on, and tells you which stage your project should actually start at.